Civil engineering · Newport

The figures should be as careful as the ground.

Estimating, bills of quantities, procurement, tendering, quantity surveying and project management for civil engineering works. An independent practice led by Jamie Martin, working for clients and contractors on groundworks, drainage, highways, utilities and infrastructure packages across South Wales and the Bristol region.

Prepare an enquiry
Director
Jamie Martin
Established
2021
Company
13286658
Base
Rogerstone, Newport

What the practice does

  1. 01

    Estimating

    Order-of-cost and pretender estimates for earthworks, drainage, highways and utilities packages, with the assumptions, exclusions and ground risks written down.

  2. 02

    Bills of quantities

    Pricing documents structured to CESMM4 or the Highways Method of Measurement so a contractor can price the work that is drawn, and a later variation can hang on it.

  3. 03

    Procurement

    A route that matches the ground risk, the programme and who should hold the design on civil packages — main contract or separate packages.

  4. 04

    Tendering

    Documents issued cleanly, queries logged, and returns compared like for like. A low return that has excluded temporary works or traffic management is not the low return.

  5. 05

    Quantity surveying

    Valuations, change and a final account for civil works that still resembles the contract. Measured against what was priced, not against the loudest voice on site.

  6. 06

    Project management

    One person holding the programme, the decisions and the commercial thread on infrastructure and civil engineering packages.

Scale, paper, and a number you can trace. The practice works from the drawing, the sections and the measure — particularly where ground conditions, temporary works and linear quantities drive the cost.

Now

Live projects

Work currently in the office, with the contractor the practice is alongside.

Park House at 20 Park Place, Cardiff.

Cardiff

20 Park Place

With Bedrock, for John Perkins

20 Park Place sits on the eastern side of Park Place, overlooking the southern end of Cathays Park. The building is Grade I listed, within the Windsor Place Conservation Area, and recorded in the National Monuments Record. A detached town house, built between 1871 and 1875 by the Marquess of Bute for his chief engineer, J. M’Connochie.

The project continues the previous use as a restaurant, with occasional use as a wedding venue. The listed building is repaired, and the ground immediately to the north, east and west is improved. The east and south extensions are altered, and the existing glass-clad extension is replaced. Inside, the main hall and the ground-floor rooms are restored. The alterations are concentrated on the basement, first and second floors, where the building has already been substantially changed.

The proposed renovation of Filwood Community Centre.

Bristol

Filwood Community Centre

With Bedrock, for Bray & Slaughter

A second renovation of Filwood Community Centre.

In partnership

Worked with

Contractors the practice has worked alongside. A name here is a working relationship, not a claim that every commercial role on their projects was ours.

How the work is done

  1. 01

    Read the drawing and the ground

    The budget is a sentence. The sections and the borehole logs are the work. The estimate starts from what is actually shown, and from what is still unknown.

  2. 02

    Write the assumptions

    Every figure leaves the office with a list of inclusions, exclusions and the ground risks still sitting with someone.

  3. 03

    Tender what can be priced

    Documents a contractor can measure against — temporary works, traffic management, disposal and haulage called out rather than buried.

  4. 04

    Hold it through the job

    Valuations, change and a final account that a person who was not in the room can still follow.